Plastering costs in 2026: a room-by-room UK guide
What homeowners typically pay for skimming, ceilings and full re-plastering — and what pushes the price up or down.
Get my free plastering quoteTypical prices by room
| Job | Typical cost | Time |
|---|---|---|
| Small room / box bedroom — skim walls | £400–£600 | 1 day |
| Medium bedroom — skim walls | £550–£800 | 1–2 days |
| Living room — skim walls | £700–£1,100 | 2 days |
| Ceiling only — skim (average room) | £250–£450 | Half to 1 day |
| Ceiling — re-board and skim | £450–£750 | 1–2 days |
| Artex ceiling — cover and skim | £350–£600 | 1 day |
| Hallway, stairs & landing | £900–£1,500 | 2–3 days |
| Full re-plaster (hack off and redo), per room | £1,000–£2,000 | 2–4 days |
Guide prices for illustration, including labour and materials. Your quote depends on your job and area.
What changes the price
Condition of the walls
Blown or crumbling plaster has to be hacked off first, which can double the labour.
Skim vs full re-plaster
A skim coat goes over sound plaster. A full re-plaster strips back to brick.
Ceiling height and access
High ceilings, stairwells and tight spaces need platforms and take longer.
Empty or furnished room
Clearing and protecting furniture adds time — an empty room is cheaper.
Boarding needed
Plasterboard and beads add materials and an extra stage of work.
Want an exact price for your room?
Send a few photos. One ID-checked local plasterer replies with a price — no spam calls.
Common questions
How much does it cost to skim a room in 2026?
Most average UK bedrooms cost around £550–£800 to skim, depending on size, condition and access.
Is it cheaper to skim or re-plaster?
Skimming is usually much cheaper. Re-plastering is only needed when the existing plaster is loose, blown or damaged.
Can I get a plastering quote from photos?
Yes. For most small jobs a trade can give a price guide from a few clear photos and rough room sizes.
How long before I can paint new plaster?
New skim usually needs 3–7 days to dry fully, longer for full re-plaster. Use a mist coat first.